[Bf-committers] Extended maintenance for Phabricator

Danny McGrath dan at blender.org
Fri Mar 11 22:02:50 CET 2022


Hi,

The phabricator specific table work should be done now. There might be some
slow spots due to caches and other system I/O, but otherwise, things should
be fine.

On Fri, Mar 11, 2022 at 10:01 AM Danny McGrath <dan at blender.org> wrote:

> Hi,
>
> I will be performing some extended MySQL maintenance tonight on the
> Phabricator database at developer.blender.org.
>
> While most of the DB tables have already been optimized, one of the
> extremely large ones, has yet to be done. This particular optimization will
> require multiple hours, mostly due to excessive HDD load on this particular
> server. Estimates place the task to be in the 2 to 4 hour range, based on
> past tables.
>
> I will aim to start the work around 2pm EST/8pm CET today. If the site
> runes without length blocking or slowdown, I may opt to leave it
> functioning. However, if it becomes a problem, I may place the site into
> maintenance mode with a banner page.
>
> I will report back here to this mail when everything is complete. Sorry
> for the inconvenience!
>
> --
> Cheers,
> Danny
>
> -------------------------------------------------
> Danny McGrath - dan at blender.org - www.blender.org
> System Administrator at Blender
> GPG key: 0x696871CA
>


-- 
Cheers,
Danny

-------------------------------------------------
Danny McGrath - dan at blender.org - www.blender.org
System Administrator at Blender
GPG key: 0x696871CA


More information about the Bf-committers mailing list