>> Or: just do 1 more week bugfix only, make 2.43a, and
>> then go back to  
>> work?
> 
> If we do that, we have a lot of reverting to do in BPY
> (I'm thinking we should have had a longer "bug fixes
> only" freeze after release).
> 
> The more I think about it, the more I think we should
> roll those changes back anyway to have a 2.44 release
> as close as possible to 2.43 (assuming we're going for
> 2.44). Two months is barely enough time for people to
> maintain their scripts (built-in AND outside scripts).

removing the bpy changes for release is fine, probably just copy in the 
2.43 files and apply a few fixes, and keep working on the Py API after 
the release.

my preference is a 2.43a bugfix release ~6 weeks sounds good too.